Bathroom 5

This room was reasonably straight forward, the client wanted it stripped out completely and refitted.  The biggest problem was moving the WC pan from one side of the room to the other which we managed to achieve by also moving the soil pipe connection.  Wet room glass panels were used around the shower tray, a bespoke mirror was made to fit with the addition of a demister pad, and an electric towel rail was added to make it dual fuel.  Once the walls were made good we re-tiled to a specific pattern requested by the client, and prepared the floor for the fitting of luxury vinyl tiles.