Bathroom 8

This was originally created as a wet room, so we had to dig the floor up, install a complete new cubicle and waste for this.  A new dual fuel towel rail was fitted and a dual spray shower valve was installed with a pump to improve the quality of the shower.  Once the walls and floor were prepared, porcelain tiles were installed on the floor and it was tiled from floor to ceiling on the walls.  Due to the size of the room we fitted a slimline vanity unit, basin and close coupled WC pan.