Bathroom 9

The Client wanted this completely stripped out and redone.  The position of the bath, basin and WC remained the same.  We installed a new bath, built in furniture for the WC and a vanity unit for the basin.  We needed electric for the towel rail to make it dual fuel, and having made the walls and floor ready the room was tiled from floor to ceiling and vinyl was fitted on the floor.  Recessed LED ceiling lights created a much brighter, lighter room.