Monthly Archives: February 2017

Bathrooom 6

This room presented a challenge as there were two levels of flooring incorporating a 5″ (130mm) step up.  We managed to remove this in the majority of the room but kept a section where the bath was.  We used a … Continue reading

Posted in Bathroom Projects | Leave a comment

Bathroom 5

This room was reasonably straight forward, the client wanted it stripped out completely and refitted.  The biggest problem was moving the WC pan from one side of the room to the other which we managed to achieve by also moving … Continue reading

Posted in Bathroom Projects | Leave a comment

Bathroom 4

The Client wanted the position of the room altered, so we moved the layout of both the WC pan, basin and towel rail onto different walls.  We had bespoke cabinets made to fit the space with a bespoke mirror above the … Continue reading

Posted in Bathroom Projects | Leave a comment